Barnet General Hospital, Hertfordshire
Defective smoke control equipment was replaced and a new control panel was installed.
Value of Project: £25,500 + VAT
Barnet General Hospital, Hertfordshire
Replacement of expansion joints between Phase 1A & 1B
Value of Project: £13,600 + VAT
Central Middlesex Hospital, London
Defective mastic joints to three external areas were carefully removed and repointed to match existing. The works were carried outside normal working hours and the areas were accessed via abseiling.
Value of Project: £2,500 + VAT
Kings College Hospital, London
Refurbishment of Lonsdale Ward bathroom. The existing defective vinyl, lining the shower cubicle walls, was removed from site and replaced once the existing plasterboard walls had been checked for water damage.
Value of Project: £1,800 + VAT
Kings College Hospital, London
Refurbishment of toilets to the main Atrium area. Defective bush boards were renewed and the vinyl flooring and ceiling tiles were replaced and redecorated.
Value of Project: £7,800 + VAT