  • "The Contractor always aims to deliver and ensures that an alternative solution is found if there are any issues arising." Barry Coleman

Barnet General Hospital, Hertfordshire

Defective smoke control equipment was replaced and a new control panel was installed.

Value of Project: £25,500 + VAT

Barnet General Hospital, Hertfordshire

Replacement of expansion joints between Phase 1A & 1B

Value of Project: £13,600 + VAT

Central Middlesex Hospital, London

Defective mastic joints to three external areas were carefully removed and repointed to match existing.  The works were carried outside normal working hours and the areas were accessed via abseiling.

Value of Project: £2,500 + VAT

Kings College Hospital, London

Refurbishment of Lonsdale Ward bathroom.  The existing defective vinyl, lining the shower cubicle walls, was removed from site and replaced once the existing plasterboard walls had been checked for water damage.

Value of Project: £1,800 + VAT

Kings College Hospital, London

Refurbishment of toilets to the main Atrium area.  Defective bush boards were renewed and the vinyl flooring and ceiling tiles were replaced and redecorated.

Value of Project: £7,800 + VAT