Hospitals

Over the past 30 years, KCH Contractors Ltd has been involved in a wide range of building maintenance and refurbishment projects, carried out on a variety of residential and commercial properties . In recent years however, as our reputation has grown due to our continuing success, the company has developed strong working relationships with its Clients in the Education and Health Sectors. You can view sample case studies for “Schools” and “Hospitals” at the pages below:

architecture-blue-build-162557

Barnet General Hospital, Hertfordshire

Defective smoke control equipment was replaced and a new control panel was installed.

Value of Project:

£25,500 + VAT

architecture-blue-build-162557

Barnet General Hospital, Hertfordshire

Replacement of expansion joints between Phase 1A & 1B

Value of Project:

£13,600 + VAT

architecture-blue-build-162557

Central Middlesex Hospital, London

Defective mastic joints to three external areas were carefully removed and repointed to match existing.  The works were carried outside normal working hours and the areas were accessed via abseiling.

Value of Project:

£2,500 + VAT

architecture-blue-build-162557

Kings College Hospital, London

Refurbishment of Lonsdale Ward bathroom.  The existing defective vinyl, lining the shower cubicle walls, was removed from site and replaced once the existing plasterboard walls had been checked for water damage.

Value of Project:

£1,800 + VAT

architecture-blue-build-162557

Kings College Hospital, London

Refurbishment of toilets to the main Atrium area.  Defective bush boards were renewed and the vinyl flooring and ceiling tiles were replaced and redecorated.

Value of Project:

£7,800 + VAT

Quality Bar-01